No menu items!

COSTA RICA'S LEADING ENGLISH LANGUAGE NEWSPAPER

HomeArchiveSan José-Caldera Highway Hits the Open Road

San José-Caldera Highway Hits the Open Road

What for 30 years has been a punch line to jokes about government inefficiency finally got moving Thursday, as President Oscar Arias and other government officials inaugurated the construction of the San José- Caldera highway.
When completed, the 77-kilometer stretch of road will cut the trip from the capital to the Pacific coast to less than an hour’s drive.
Minister of Public Works and Transport Karla González said concessionaire Autopistas del Sol – a consortium made up of a Spanish, a Portuguese and a Costa Rican company – has 30 months to complete the highway.
The cost of the project is estimated at $230 million, three quarters of which will be financed by the Central American Bank for Economic Integration and the Caja Madrid, with the consortium putting up the remainder of the money out of its own pocket.
Autopistas del Sol will pay back the loan by operating and maintaining the highway through a 25-year concession that allows it to collect a toll of $2.70 from vehicles traveling the length of the highway (partial trips will be prorated).
Since its conception in 1978, the San José-Caldera highway has been plagued by setbacks and delays. Over the years numerous attempts have been made to get the project moving, with little to show for it.
At the turn of the century, it appeared the highway would finally become a reality as the government completed construction on five bridges for the highway, but for seven years the bridges have been to nowhere, unused except by locals traversing the dirt track where the highway is planned.
This decade alone has seen three consortiums try to take on the enormous project through a government-granted concession.
The first collapsed due to internal conflicts, and the second pulled out in 2004, saying the government wasn’t expropriating land fast enough.
Autopistas del Sol took over the concession in 2005, but that arrangement almost derailed in 2006 when the government decided the highway design – and price – needed an update, triggering more time-consuming reviews from the Comptroller General’s Office.
 

Trending Now

Protests Rise Over Panama Canal’s New Water Project

Panama’s President José Raúl Mulino on Tuesday defended the construction of a new reservoir for the interoceanic canal and criticized those who oppose the...

Costa Rica Surf Film Festival Honors ‘Pura Vida Bodysurfing’ with Top Audience Award

Pura Vida Bodysurfing is an award-winning short film that strips surfing back to its essence—riding waves without a surfboard. Filmed across Costa Rica’s legendary...

Costa Rica’s Eyelash Viper Snake Is One of the Most Beautiful

There are at least 141 different species of snakes in Costa Rica. With that large number of species packed into such a tiny nation,...

2025 Gold Cup: Honduras Advances After Dramatic Shootout, Mexico Ends Goal Drought

Honduras, with a surprising and dramatic penalty shootout victory over Panama, and Mexico, with a lackluster win against Saudi Arabia, advanced Saturday to the...

Guatemala Makes History as They Face USA in Gold Cup Semifinal Showdown

Desperate to show progress under Mauricio Pochettino, the United States is looking to secure a return to the CONCACAF Gold Cup final on Wednesday...

A Costa Rica Love Story: From Rustic Cabina to Separate Dreams

My Tica wife and I have been together for over a quarter century. When we met, I was living a simple life here. Three...
Avatar
spot_img
Costa Rica Tours
Costa Rica Coffee Maker Chorreador
Costa Rica Coffee Maker Chorreador
Costa Rica Travel Insurance
Costa Rica Rocking Chait
Costa Rica Travel

Latest News from Costa Rica