No menu items!

COSTA RICA'S LEADING ENGLISH LANGUAGE NEWSPAPER

HomeNewsCosta Rica Drivers Face Delays Near Tarcoles Bridge

Costa Rica Drivers Face Delays Near Tarcoles Bridge

Drivers heading between Costa Rica’s Central Valley and the Central Pacific should prepare for delays this week as the Tárcoles bridge on Route 34 returns to single-lane operation for final rehabilitation work. The bridge, widely known as the Crocodile Bridge because of the large crocodiles often seen below in the Tárcoles River, is one of the main links for travelers heading to Jacó, Manuel Antonio, Quepos, Dominical, Uvita and other Pacific coast destinations.

The latest schedule from the Ministry of Public Works and Transport shows one-lane regulated traffic from yesterday at 6 a.m. through 11:59 p.m. Friday, May 8, and again from 6 a.m. Monday, May 11, through 11:59 p.m. Friday, May 15. Traffic will return to two lanes on Saturday and Sunday.

The work involves installing expansion joints on the upper part of the bridge. These joints allow the structure to expand and contract with temperature changes and vehicle loads, making them an important part of the bridge’s long-term operation.

Traffic will move one direction at a time, with workers controlling the flow in alternating intervals. The speed limit in the work zone is 30 km/h. MOPT and CONAVI are asking drivers to follow signs, obey workers in the area, and plan extra time before traveling.

The Tárcoles bridge is a choke point even on a normal day. With only one lane open, those going there should expect backups that can add one to two hours, especially during peak travel periods and late afternoons when beach traffic heads back toward San José.

The work forms part of the Emergency Program for the Comprehensive and Resilient Reconstruction of Infrastructure, known as PROERI, and is funded with $6.73 million from the Central American Bank for Economic Integration.

The bridge is not the only trouble spot on Route 34. Separate stabilization work continues at kilometer 27 between Tárcoles and Herradura, where crews are working on slope stabilization through June. That project is also affecting daily travel, with regulated traffic expected from 6 a.m. to 5 p.m.

Together, the two work zones could make the drive to the Central Pacific slower than usual for those using the Costanera Sur. The best option for anyone heading to Jacó, Manuel Antonio, Quepos, Dominical or Uvita is to leave earlier than usual, check live traffic before departure, and avoid tight airport, hotel or tour connections on the same travel day.

The inconvenience is temporary, but the timing is rough for one of Costa Rica’s busiest tourism routes. Until the work is finished, the Bridge will remain a place that will test your patience. For those heading to the airport or any pressing engagements, make sure to leave yourself plenty of time.

Trending Now

Mother’s Day Is a Full National Holiday in Costa Rica

Today is Día de la Madre, and it is a full national holiday in Costa Rica, not just a greeting-card occasion. Public offices are...

Costa Rica Flooding Forces 500 Into Shelters as Pacific Side Runs Dry

Two tropical waves in three days left the Caribbean and Northern Zone saturated while the Pacific sits in its driest stretch of the year. Here is what the next four weeks look like.

Family Demands Answers on Missing Political Prisoners in Nicaragua

Relatives of a retired military officer and his wife, who were detained a year ago in Nicaragua, demanded Saturday that the government of Daniel...

Nurses Strike at Hospital México After Staffing Talks Collapse

More than 180 nurses walked out at one of Costa Rica's three national referral hospitals after talks with the CCSS ended without agreement.

Costa Rica Expands Online English Classes to 100 Rural Schools

More than 2,000 children in rural Costa Rican communities are now receiving English lessons through a technology-based program that connects small schools with specialized...

Route 32 shut again with a reopening decision due this morning

Route 32 between the Central Valley and Limón remained closed early Tuesday pending a MOPT inspection. What the detours look like and why the slopes keep failing.

Williams Sisters Lose Cincinnati Open Doubles Thriller

Serena and Venus Williams came within two points of completing a dramatic comeback Monday night, but their long-awaited doubles reunion ended with a 2-6,...

Costa Rica Declares a National Emergency in Nine Flood Hit Areas

Costa Rica has declared an emergency in nine areas after days of heavy rain caused flooding, damaged roads and left more than 700 people in shelters

Panama Canal Cuts Ship Traffic as El Niño Drought Worsens

The Panama Canal will allow fewer ships to pass through the waterway beginning in September as a drought linked to El Niño reduces the...
🌴 The Weekly Pura Vida

Costa Rica, Once a Week

The week's top stories, weather & insider tips — delivered every Sunday. One email, zero clutter.

🔒 Free. No spam. Unsubscribe anytime.

Loading…

Latest News from Costa Rica

Costa Rica Coffee Maker Chorreador
Costa Rica Car Rentals
Costa Rica Travel Insurance
Costa Rica Travel