No menu items!

COSTA RICA'S LEADING ENGLISH LANGUAGE NEWSPAPER

HomeTopicsEnvironment and WildlifeGovernment updates Costa Rica decarbonization efforts

Government updates Costa Rica decarbonization efforts

The Costa Rican government on Wednesday updated the progress of the country’s decarbonization efforts.

The Presidency says 90.7% of the 2022 targets are underway, while 25% of the objectives set for the initial stage (2018-2022) have already been met. Notably, the Costa Rican Electricity Institute and the National Power and Light Company have reached a 100% renewable electric matrix, the government says.

Among the other highlights:

Zero-emission light transport: 35 government institutions acquired 332 electric vehicles. In addition, 62.3% of the target for installing charging centers for vehicles scheduled for 2022 was met, by implementing 43 of the 69 fast power centers planned.

Renewable electricity at a competitive cost: The Costa Rican Electricity Institute (ICE) and the National Power and Light Company (CNFL) met the goal of maintaining a 100% renewable electric matrix in 2020.

In addition, a report on the marine wind potential for electricity generation in Costa Rica was completed, as was the identification of the Punta Descartes Marine Wind Project.

Sustainable and low-emission buildings: The Ecological Blue Flag Program was created in the category of “Sustainable Construction.” In addition, 736 buildings and 29 municipalities were awarded in the climate change category of the Ecological Blue Flag Program.

170 companies with carbon neutrality declarations were verified under standards of the Country Carbon Neutrality Program and the INTE B-5 standard.

Comprehensive waste management: With respect to wastewater management, project advances of 14.2% is reported in Palmares, 14.25% in Jacó, 14.3% in Quepos, 14.83% in Golfito and 14.83% in Limón. In addition, the progress of the Environmental Improvement Project of the Metropolitan Area of San José is reported at 75.5%.

Nature-based solutions: The goal of restoring at least 3 km of Urban Corridors was exceeded, after achieving the restoration of 64 hectares in the María Aguilar Interurban Biological Corridor and three hectares in the Torres Interurban Biological Corridor.

The Ministry of Environment and Energy (MINAE) and the Costa Rican Institute of Aqueducts and Sewers (AyA) launched “Clean Rivers,” a strategy that will last until 2030. On the other hand, a regional strategy for the conservation of mangroves in the Gulf of Nicoya was officialized.

Read the full report from the Presidency here. 

Trending Now

U.S. Strikes Drug Boat in Pacific Near Colombia, Killing Two

The United States military carried out its first strike in the Pacific Ocean against a boat suspected of drug trafficking, killing two people near...

Belize Signs Safe Third Country Deal with US for Asylum Seekers

Belize and the United States have sealed a deal that positions Belize as a temporary host for migrants pursuing asylum in the U.S., according...

Panama Canal to Build Two Ports by 2029, Boosting Capacity

The Panama Canal plans to build two ports for $2.6 billion by 2029 amid uncertainty over the future of Hong Kong–based concessionaire Hutchison Holdings,...

Venezuela Arrests Suspects in Alleged CIA Cell Plotting Attack

Venezuela claimed Monday to have dismantled a CIA-financed cell plotting a false-flag attack on a US warship deployed to the southern Caribbean, as Washington...

US sanctions Colombia’s President Gustavo Petro

The United States announced on Friday financial sanctions against Colombian President Gustavo Petro for failing to combat drug trafficking, drawing a strong response from...

Costa Rica Welcomes Ed Sheeran Back for Loop Tour Show

British singer-songwriter Ed Sheeran will wrap up the Latin American leg of his Loop Tour with a performance in Costa Rica on May 30,...
spot_img
Costa Rica Coffee Maker Chorreador
Costa Rica Coffee Maker Chorreador
Costa Rica Travel Insurance
Costa Rica Rocking Chait
Costa Rica Travel

Latest News from Costa Rica