No menu items!

COSTA RICA'S LEADING ENGLISH LANGUAGE NEWSPAPER

HomeNewsCosta Rica Road to Close for Two Weeks for Bridge Construction

Costa Rica Road to Close for Two Weeks for Bridge Construction

Route 606 will be closed starting at 6:00 a.m. on Thursday for the construction of a bridge over the Guacimal River. The project includes the construction of a two-lane bridge, one lane in each direction, as well as a pedestrian walkway. This route connects Monteverde with the North Inter-American Highway.

Construction of the new concrete structure began on December 2 with preparatory work. This Thursday, January 15, traffic will be suspended at the Guacimal River crossing on this highway in order to relocate the temporary bridge currently in service to another location, making room for construction of the permanent bridge.

The Road and Bridge Construction Management Department of the National Road Council explained that since early December, work has been underway to prepare the foundations that will support the prefabricated bridge at a site a few meters from its current location. This will allow traffic to continue flowing through the area while the new bridge is being built.

The relocation and commissioning of the metal bridge at the new site are expected to take approximately two weeks, during which time there will be no passage through this section of National Route 606.

Once the site has been cleared, construction of the new permanent structure will begin. The project has an estimated cost of ¢730 million (approximately $1.45 million). In addition to the concrete bridge, the project includes the construction of approach roads on both sides, as well as horizontal and vertical signage.

The road connecting the Monteverde area in Puntarenas with the North Inter-American Highway will be improved at the Guacimal River crossing. After 200 effective workdays, approximately nine months, the 35-meter-long concrete bridge is expected to be put into service.

During the transfer of the modular bridge, users will not be able to travel between the Inter-American North Highway and Monteverde, except for access to homes or businesses. Even in those cases, crossing the Guacimal River will not be possible.

During this approximately two-week period, users will need to detour via National Route 605, crossing the Lagartos River and continuing to the intersection with Route 606 near the El Sol restaurant, or vice versa, covering about 15 kilometers. From that intersection, drivers may resume travel on Route 606 toward Santa Elena de Monteverde or in the opposite direction.

Trending Now

Honduras Keeps Extradition Pact with U.S. After Trump Pardon

Honduran President Xiomara Castro pulled back the termination of her country's extradition treaty with the United States on January 10, just ahead of her...

Trump Announces Venezuela Oil Transfer Worth Billions

President Donald Trump announced on Tuesday that Venezuela plans to transfer between 30 and 50 million barrels of crude oil to the United States....

Panama and US Set to Launch Canal Defense Drills

Panama and the United States will start joint military exercises on Monday to bolster defenses around the Panama Canal. This marks the first extended...

Honduran Lawmaker Survives Explosive Attack in Congress

A homemade explosive device struck Honduran lawmaker Gladis Aurora López inside the National Congress on January 8, causing injuries that sent her to the...

Costa Rica Takes Home Top Wellness Honor from European Health Magazines

Costa Rica has won yet another major honor in the global travel scene, earning the title of Best International Destination at the Healthy Places...

Madison Keys Leans on Adelaide Success for Australian Open Repeat Bid

American tennis star Madison Keys arrived in Adelaide on Sunday, ready to tap into the success she found there last year. That victory at...
Costa Rica Coffee Maker Chorreador
Costa Rica Coffee Maker Chorreador
Costa Rica Travel Insurance
Costa Rica Travel

Latest News from Costa Rica